 |
Maintenance and Testing of Indoor Switchgears and Switchboards, from 208V up to 27.6 KV |
 |
Contact Resistance |
 |
Insulation Resistance (Megger, Hi-Pot) |
 |
Protection Relays |
 |
Breaker Operation and Lubrication |
 |
Maintenance of Outdoor Switchgears |
 |
Maintenance of Transformers, Liquid-Filled and Dry Types |
 |
Transformer Ratio |
 |
Insulation Resistance |
 |
Doble Testing |
 |
Insulation Capacitance and Dissipation Factor |
 |
Instrumentation and Controls |
 |
Oil Sample Testing and Gas Analysis |
 |
Partial Discharge Test for Cables, Transformers, Reactors, Switches |
 |
Inspection and Testing of DC and AC Drives |
 |
Thermographic (Infrared) Scanning |
| |
|